Road Closure Advisory - West Utility Plant Summer Pipe work
Full Description
Phase 2-
- All VDOT pipework has been completed ahead of schedule. The DuPont Bridge reopens at 5:00 pm Friday June 12th.. A small portion of Wake Drive remains closed. Closure expected to last through July 24th