Power Plant (Renovation)

  • Power Plant
    Power Plant  The award of a construction contract for a cooling plant addition is expected to occur in early 2009.  
Photo - of -

Renovation of the 1952 plant includes interior demolition, installation of a new underground storage tank, replacement of the structural frame/floor slab under boiler #1, boiler replacement and installation of direct digital controls capable of integration with the campus wide Building Automation System (BAS). Temporary boiler installation will occur to ensure service is uninterrupted during construction.

  • Cost: $ 13.6-million
  • Fund Source - GF, 9d Bond
  • Renovation GSF:
  • Expansion GSF:
  • Start Date:
  • Finish Date: June 2009
  • Design Team: RMF Engineering
  • Contractor: Frank Lill & Son
  • Progress: Construction is complete.  Temporary occupancy was received and the final inspection was June 10, 2009.